
Typical gain
2x output
Install
1 day
Grid paperwork
Included
Workmanship
10 yrs
Overview
What's included
Many Perth roofs still carry systems from 2010-2012 with small string inverters that are near the end of their life. A new inverter with a few extra panels often doubles the output on the same roof.
Upgrades go through the same calculator: enter your roof and bill and choose the size. We will tell you during the survey what can be kept.
The grid application covers the new total size, so we handle the paperwork for the change.
Inverter swaps
Extra panels
Battery add-on
Safety check
How We Work
Our process for system upgrades
01
Check
Survey of the old system and the roof.
02
Design
Keep, extend or replace, explained plainly.
03
Approval
New Western Power application.
04
Install
Old gear removed and recycled.

Ready when you are
Let's talk about your system upgrades project
A quick consult is often enough to shape a great plan. We're here when you are.


